FIRST SOUTH EAST EUROPEAN REGIONAL
CIGRÉ CONFERENCE

7th – 8th June 2016, Portoroz, Slovenia

TOPIC 2

Submarine Cables Issues in the Region

Adriatic projects, Mediterranean projects, other long term projects, submarine environmental issues, deep undersea cases, acquired good practice, economy of projects, new technologies of submarine cables.

Fitting to working program of CIGRÉ SC B1 – Insulated Cables

Chairman: M. Pompili (Italy)

Co-chairmen: M. Ostojić (Montenegro), F. Muzi (Italy)

Paper No. Authors and Paper Title Paper Presentation
 

Invited Speaker:

Pierre Argaut, chairman of CIGRÉ SC B1 – Insulated Cables

 
2-01

Luigi Colla, Luisa Vittoria Lombardo, Nikola Kuljaka, Ernesto Zaccone (Italy):

Submarine projects in the Mediterranean Sea. Technology developments and future challenges

2-02

M. Rebolini, G. Lavecchia, L. Guizzo, F. Perda (Italy):

Submarine cables HV DC&AC in the Mediterranean Sea - Terna experience

2-03

Gülnazi Yüce, Celalettin Ulubalci (Turkey):

400 kV - 2 x 1000 MW Submarine Cable Crossing of the Dardanelles Strait in Turkey

2-04

S. Martorana, L. Moiana, F. Palone, M. Rebolini, N. Rivabene (Italy):

Modern energy infrastructures for connecting isolated EU countries in a sustainable way:
the Malta-Sicily Interconnector

2-05

Milutin Ostojić, Martin Ćalasan (Montenegro):

Magnetic Field of the Bipolar HVDC Cable Italy-Montenegro in the See and in the Land Section

2-06

M. Jeroense, O. Hansson, A. Tyrberg, E. Rebillard, K. Cronholm, J. Lindhe (Sweden):

Deep Water Power Cable Systems? – Indeed!

2-07

J. Kabouris, K. Tsirekis, A. Georgopoulos, I. Aravanis (Greece):

The Interconnection of the Cycladic Islands: A Major Innovative Transmission Project for the Greek EPS

2-08

Massimo Pompili, Bruno Antonio Cauzillo, Romeo Rendina (Italy):

An Innovative Concrete-Steel Anode for HVDC Submarine Links: Ideas for Designing of a Prototype

2-09

Toni Dropulić, Gordan Mirošević, Milivoj Šutej (Croatia):

Replacement of 110 kV submarine cables in Croatian North Adriatic

2-10

Srećko Aljinović, Mario Gudelj, Leo Štrbac, Ivan Topić (Croatia):

Removing 3-core Oil-Filled Submarine Power Cable Dugi Rat –Postira from the Seabed

2-11

Detlef Wald (Switzerland), Florin Ciuprina (Romania):

Is water treeing a problem for high voltage cables?

2-12

Paolo Maioli (Italy):

Measurement of flexural rigidity of submarine cables

2-13

Frank Petzold, Dominik Nowak, Matthias Müeller (Germany):

Cable Fault Location on long HVAC and HVDC Cable Systems

2-14

Antony Zymelka (United Kingdom):

Subsea Cables: Reducing Project Costs and Managing Cable Risk from Pre-feed through to Manufacture, Installation and Commissioning

2-15

Srećko Aljinović, Mario Gudelj (Croatia):

Solving the Corrosion Problems on Armour Clamps on 110 kV Single-core Submarine Cables

2-16

Reza Karimi (Iran):

Partial discharge detection for assessment of the quality of XLPE high voltage cables in use

2-17

L. Calcara, B. A. Cauzillo, M. Pompili (Italy):

Soil Thermal Gradient due the Ambient Temperature and its Correlation with Failure of MV Underground Cables